标题: 请问各位ECP代表是什么? [打印本页]

作者: huanghongshuai    时间: 2011-12-16 16:53
标题: 请问各位ECP代表是什么?
顾客要求我们提供ECP报告,请问大家一下,谢谢了。
作者: Y305799518    时间: 2011-12-19 10:32
背景信息不完全,可能是:   工程更改程序(Engineering Change Procedure)
作者: svw0936    时间: 2011-12-19 12:11
ECP视频会议测试报告?
作者: 王治    时间: 2011-12-19 13:55
背景信息不完全,可能是:   工程更改程序(Engineering Change Procedure)
) r/ s! l4 X% B4 D7 Z; OY305799518 发表于 2011-12-19 10:32 http://www.3dportal.cn/discuz/images/common/back.gif

: N; d5 X: C) K- i! W1 KISO90016 F8 r- N" D0 G
7.3.7 Control of design and development changes
9 ]  |& D/ Z7 w设计和开发更改的控制
" W2 w( d5 U: H; MDesign and development changes shall be identified and records maintained. The changes
8 h: i. |. l+ f6 C1 n, eshall be reviewed, verified and validated, as appropriate, and approved before
( c; S+ k) Q( O) d7 g* X% Kimplementation. The review of design and development changes shall include evaluation of
) x$ a+ ]5 Z1 ^" m) uthe effect of the changes on constituent parts and product already delivered. Records of the1 S% P. H( `: E
results of the review of changes and any necessary actions shall be maintained (see 4.2.4).2 B; i. I; i* b: B5 W. k7 \
应识别设计和开发的更改,并保持记录。在适当时,应对设计和开发的更改进行评审、验证和确认,并
. }# J8 @2 \5 N! Y8 U0 s7 l在实施前得到批准。设计和开发更改的评审应包括评价更改对产品组成部分和已交付产品的影响。更改
3 r, _0 V. i+ B3 j评审结果及任何必要措施的记录应予保持(见4.2.4)。
作者: jstcchenxiao    时间: 2011-12-20 08:14
我只听过epc没听过ecp
作者: svw0936    时间: 2011-12-24 09:43
我只听过epc没听过ecp( Q4 q, r% P" ~* v: Y2 @
jstcchenxiao 发表于 2011-12-20 08:14 http://www.3dportal.cn/discuz/images/common/back.gif
8 Z+ ^8 w% j- I4 v! S$ t
EPC又是什么?